PlanBD
Back to Learn
Report
report
pdf
audit-trail
compliance

The 14-Section Development Report

১৪-অধ্যায়ের উন্নয়ন প্রতিবেদন

What the report covers

After you run the FAR Calculator, PlanBD assembles a structured development report (web view + PDF export):

#SectionContents
1Executive SummaryFinal FAR, key metrics, 4-step FAR composition
2Site InformationPlot inputs, block, zone, road width
3FAR AnalysisPlot / Area / Base / Incentive / Final FAR waterfall
4Development PotentialBuildable GFA, footprint, height guidance
5Ground CoverageBidhimala Table 3 min/max band + open space
6SetbacksBidhimala Table 1 diagram + distances
7Unit AnalysisPermitted / maximum / FAR-based units
8Development ScoreFeasibility score for investors
9Floor AnalysisG+N scenarios at min / mid / max GC
10Coverage ScenariosTrade-offs with pros and cons
11Incentive AnalysisApplied and missed bonus FAR
12Regulatory CompliancePass / warn / fail checklist
13Land Use AnalysisZone × category permission
14References + audit trailCitations and step-by-step formulas

Audit trail

Every numeric result links to a calculation step with regulation source (DAP volume, SRO section, Bidhimala table). This supports professional review — outputs are decision-support, not RAJUK approval.

PDF export

The PDF mirrors the web report layout. Export from the calculator results panel or POST /api/report/pdf.

For technical detail see Regulations → Data & methodology.

References

  1. [1]

    FAR calculation methodology

    PlanBD · Regulations → Data & methodology

  2. [2]

    Regulatory citations in audit trail

    SRO 466/2025 · Appendix 3.5 & 3.6

  3. [3]

    Bidhimala coverage and setbacks

    Bidhimala 2025 · Table 3 & Table 1